Laserfiche WebLink
,~ <br />VI. Specific Requirements. <br />A. Copv of Plan. <br />A copy of the Eastside Mine Stormwater Management Plan will be <br />kept on-site and will be readily available to the personnel <br />involved with compliance of the plan. <br />S. Statement of Certification. <br />To the best of my knowledge, all the information presented in <br />this application is true and correct. Eastside Coal Company, <br />Inc. will comply with the Eastside Mine Stormwater Management <br />Plan as presented. <br />U, 19 9Z <br />Date <br />„k~ a <br />(Signature by individual Iega~`ly <br />authorized to bind the operator <br />to this application) <br />General Manager <br />Title <br />r~ <br />9 <br />