Laserfiche WebLink
PART I <br />Page No. 10 <br />Permit No. COG-850000 <br />• B. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS <br />2. Stormwater Management Plan (SWMP) (continued) <br />f) Emolovce Education - <br />The permittee shall develop and implement employee education programs to inform personnel at all levels of <br />responsibility of the components and goals of the SWMP. Education should address topics such as spill response, <br />good housekeeping and material management practices. The permittce shall identify periodic dates for such <br />instruction. <br />3. Monitoring Requirements <br />In order to obtain an indication of the probable compliance or noncompliance with the effluent limitations specified is <br />Part I.B.1, the permittee shall monitor all effluent pazameters at the following frequencies. <br />a) Active Mining Outfalls <br />Parameter Measurement Frequency Sample Type <br />Flow, MGD Weekly Instantaneous <br />or Continuous <br />TSS, mg/P Monthly Grab <br />Total Iron, mg/P Monthly Grab <br />• Settleable Solids, mP/P Monthly Grab <br />Oil and Grease, mg/P Wcekly Visual <br />pH, s.u. Weekly In-situ <br />Total Dissolved Solids, mg/P Quarterly Grab <br />CO River Basin ONLY <br />Total Phosphoms (as P), mg1P Quarterly Grab <br />Dillon Reservoir and I pper Beaz Creek* <br />Drainages Only <br />b) Post-Mining Outfalls <br />Parameter .... <br />Measurement_Frequency <br />Sample Type <br />Flow, MGD Monthly Instantaneous <br /> or Continuous <br />Settleable Solids, mP/P Monthly Grab <br />Oil and Grease, mg/P Monthly Visual <br />pH, s.u. Monthly In-situ <br />Total Dissolved Solids, mg/P Quarterly Grab <br />CO River Basin ONLY <br />/P <br />• T <br />l Ph <br />h <br />P l G <br />b <br />ota <br />osp <br />oms (as <br />), mg Quarter <br />y ra <br />Dillon Reservoir and Upper Beaz Creek* <br />Drainages Only <br />See Part I.C. for Definitions <br />