Laserfiche WebLink
<br />EXHIBIT D - Mining Plan (Coot) <br />d. The size of the area affected by the mining/milling plan (and <br />the related disturbance classification) can be seen on maps: <br />EXHIBIT D - Mining/Milling Plan <br />EXHIBIT D - American Tunnel Portal Area <br />EXHIBIT D - Ore Body Location - Sunnyside Mine <br />3. (i) An estimate of the lifetime of the Sunnyside Mine ore body is <br />twenty years to an indeterminable time, depending on a continuing <br />exploration program and the resulting ore reserves outlined. <br />The phases and size of location of the work area relating to <br />the milling program are directed solely to Tailings Pond No. 4 and <br />its projected yearly growth. These phases and stages can be seen <br />on EXHIBIT D, Mining/Milling map. <br />The ore occurs in vertical or steeply dipping veins. Ore <br />• bodies are eight feet to twenty-five feet in thickness. Iii <br />addition to the ore itself, only a small amount of the vol~;anic <br />host rock is removed in production. <br />I :M) Y ~G~~ 'L.MN~~..1' S D ~ AGSt( o~ c - y ~ y-_ 1, <br />~~~~??> <br /> G .re ~ - ~ t <br />>« s. ~`~..' QS ` <br />c.''C M~ K S ~ z~'cs <br />~J <br />J <br />~\ <br /> <br />.~ <br />M..~l\~~ <br />~~s ~~ ~~~ <br /> <br />-~~a o Y. Vic. ~... M.9~~1. <br />,~ `-v2 ~ ~ ac5- <br />~.~ srf~d ~ls_. ,~PAes r-~t. <br /> <br />-10- <br />.. ~i <br />