Laserfiche WebLink
EXHIBIT E - Reclamation P1• (Cont) • <br />the topsoil stockpile, obtained during construction of the Tailings Pond No. 4 <br />starter dam. <br />REVEGETATION - Consldering the climate, topography and land use designations of the <br />vicinity, it was decided that establishment of forest habitat was the best form of <br />reclamation. Establishment of indigenous and introduced plant species is desired <br />to create a stable and diverse community in which natural succession can occur. <br />Techniques of seedbed preparation used in this reclamation plan for initial vegetation <br />establishment have proven successful at this site. After one planting season, pioneer <br />communities are doing well without continued soil amendments. Another four years <br />will be required on these initial reclamation sites to determine ecosystem stability, <br />though. <br />n <br />U <br /> <br />-22- <br />