My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE115978
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE115978
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:11:54 PM
Creation date
11/25/2007 1:35:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984067
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
EXHIBIT 5 BONDING AND RECLAMATION COSTS REVISED
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
surface and prevent public access. The seals will be placed within the <br />entry near the surface and the remaining exposed entry will be <br />backfilled during backfilling activities in the portal face-up area. <br />BACKFILLING PORTAL FACE-UP AREA AND SEDIMENTATION POND/CATCHMENT BASIN <br />Peerless has utilized an area left exposed by previous mining operations <br />and has performed some initial work to provide a stable portal face-up <br />area. Upon mine closure, the portals will be sealed as previously noted <br />and a D-8K dozer and one or more 6216 scrapers will be utilized to <br />backfill the portals and cover the exposed coal seams. The backfill <br />material will be approximately 25 feet in height at the face and slope <br />to the west at a 3:1 slope to ensure stability and minimize erosion. As <br />previously noted, concrete rubble from facility foundations will be <br />placed at the base of the fill. This will be covered with material from <br />the containment berm for Ditch No. 1 and excess cut material from the <br />facilities area. A minor amount of excess cut material from the <br />facilities area will be placed immediately adjacent to the sedimentation <br />pond/catchment basin area to be used for backfilling when this area is <br />reclaimed. Upon completion of reclamation, when these facilities are no <br />longer required for sediment control, the sediment pond and catchment <br />basin will be backfilled and graded by pushing the stockpile material <br />from the facilities area as well as the road which is immediately above <br />the sedimentation pond into the impoundment area and recontouring the <br />entire area to blend with the surrounding terrain. <br />SITE RECONTOURING AND GRADING <br />Once all structures have been removed and backfilling has been <br />completed, the entire site will be recontoured to provide drainage, <br />minimize erosion, and blend with the surrounding terrain. A D-SK dozer <br />will be utilized to recontour the site to the configuration shown on the <br />Postmining Topography Map (Map 4). A 12G motor grader will be used in <br />conjunction with the dozer to grade the site to its final configuration. <br /> <br />-5- <br />
The URL can be used to link to this page
Your browser does not support the video tag.