Laserfiche WebLink
<br />RECLAMATION COST ESTIMATE SUMMARY <br />AREAS OF DISTURBANCE TO BE RECLAIMED <br />• Portal face-up area <br />• Sedimentation pond and catchment basin <br />• Mine facilities area <br />• Stockpile areas <br />• Prior disturbance on first bench area above sedimentation pond <br />RECLAMATION COST SUMMARY <br />• Equipment removal and salvage $ 1,310 <br />• Structure removal and salvage or demolition 3,690 <br />• Sealing and backfilling mine portals 2,350 <br />• Backfilling portal face-up area and sediment <br />pond/catchment basin 9,520 <br />• <br />• <br />• <br /> <br />Site recontouring and grading 1,240 <br />Ripping 310 <br />Topsoil/substitute replacement 7,610 <br />Seedbed preparation and contour furrowing 160 <br />Mulching 1,330 <br />Seeding 610 <br />Reclamation Cost Sub-Total $28,130 <br />Contractor Profit and Contingency (20%) 5,626 <br />Total Estimated Reclamation Cost $33,756 <br />-3- <br />