Laserfiche WebLink
<br />• <br />Bence will continue to occur at these structures. <br />Conclusions <br />The observed subsidence during this monitoring period is com- <br />parable to the predictions made by RMG in the Mining Permit. <br />No structural damage has been observed nor is any expected. <br />Further subsidence with respect to the monitored structures and <br />monuments is expected to be minimal and within the maximum <br />values predicted in the Mining Permit. <br />• <br />• <br />