• preceeding survey. Th <br />Monument 4 (1.09 total <br />expected subsidence, as <br />It is anticipated that <br />continue to be minimal. <br />maximum subsidence continues to be at <br />feet) which is comparable to the maximum <br />predicted by RNG, in the Mining permit. <br />future subsidence above 'A' Panel will <br />City of Florence Water Line <br />Data collected for the water line monuments, as shown on the <br />summary table, are compared to a survey conducted during Nay, <br />1985. Data collected prior to 1985 by contract surveyors were <br />inconsistent and inconclusive, apparently due to errors in the <br />benchmark elevations that were used. The maximum subsidence <br />detected occurs at Monument 'E' with a total displacement of 0.21 <br />feet. Of this, 0.17 feet of subsidence occurred between Septem- <br />ber, 1985 and April, 1986. During this time retreat mining passed <br />under Monument "E` in the 5 South Section. The observed subsi- <br />dence is probably a result of mining activities although ite <br />magnitude is much less than the RMG prediction of 2.79 feet. It <br />is expected that minor subsidence will continue to occur but at a <br />decreasing rate with time. <br />• The remaining monuments displayed insignificant movement (+0.02 to <br />• -0.04 feet) due to no undermining taking place. It should be <br />noted that Monument "A" is no longer monitored. Due to the align- <br />ment change made by the City of Florence during the spring of <br />1985, Monument "A" is located approximately 300 feet away from the <br />water line, and its continued monitoring would not represent <br />subsidence effects to the line. <br />Newlin Creek Streambed <br />The single subsidence monument established along Newlin Creek in <br />May, 1985, has subsided a total of 0.6 feet to present. The <br />entire displacement occurred during the period between Nay through <br />September, 1985. Mining in this area, which was completed in <br />1982, was development mining only. The above mentioned subsidence <br />would not be expected to have occurred as a result of this mining <br />activity. The mining section under the Monument (1 North) is <br />situated under an abandoned mine, separated by 20 to 30 feet of <br />interburden. The 1 North Section (along with the old works) were <br />allowed to fill with water until early 1985, when efforts began to <br />de water this area. It is possible that roof collapse in the old <br />works, due to dewatering, manifested as subsidence. Continued <br />monitoring of the Newlin Creek Monument should indicate only minor <br />additional subsidence of this area. <br />Thompson Ranch Structures <br />. Subsidence monitoring stations were established on the three <br />structures existing on the property during May, 1985. Survey data <br />collected to date indicate minor subsidence ranging from 0.2 to <br />0.5 total feet. The data from the preceeding survey indicate that <br />no subsidence occurred. It is anticipated that only minor subsi- <br />