Laserfiche WebLink
•' ~ • <br />~, ~ (k) All construction will stay at least 100 feat distance <br />• ~ <br />from creeks, lakes or springs and fording of creeks or , <br />I ~ <br />temporary bridges will be aC only approved locations. <br />5.'•`(a) The following heavy equipment will be used et the work <br />Dozer Int. 25C, wheeled loader; <br />sites in conduct of the operation:Michigan 175B 5yd.3, 945 cone crus{~er <br />Joy MS4E air, truck-EUC RZZ 25ton, (specify type and size <br />1050 Joy .compressor, <br />and related screens'6•conveyors', "'` <br />of all earth moving equipment) ' <br />6, (a) The type of work to be done et the work sites which will <br />• result in surface.resource disturbance will be: Excavation i <br />(s ecify <br />of limestone by open pit mining and constructton o£ access ~ <br />road and stockpile area. <br />hand-work, drilling, sampling and testing, excavation of <br />cuts, pits or Crenches, sinking shaft(s). driving edit(s). <br />other} <br />(b) Work will begin March 1, 1977 and Germinate <br />• (approximate date) ~ •' <br />I <br />Year 2027 <br />(approximate date) <br />' 7. (a) The acres o£ land which will be disturbed are estimated et <br />approximately 80 acres. , <br />8. (a) The planned operations will include milling or <br />(will or will not) <br />scr~ operations and wherein such operations will ~r. <br />I <br />require procflssing of mineral materials, the type of <br />~ process will be <br />(gravity, flotation, electro-magnetic, <br />i <br />leaching, cyanidation, heavy-media separation, etc.} <br />i <br />(b) Approximately nnnP of land will be required for <br />solid waste, and n .acres will be required for <br />~ • P, <br />1 ~- .. <br />' - <br />f~ <br />/~ ' <br />