Laserfiche WebLink
• <br />3. <br />,t (c) The access road will be of minimum standard commensurate with <br />'the scads of the operatioa and be Temporary \ <br />(temporary or permeneat) <br />' type construction. <br />'....., <br />• (d) Road or trail construction will meat 14' width <br />~•, (SIr10-30, etc.) <br />Forest Service Engineering Design standards and specifications. <br />• <br />(e) Construction of the road or trail will not commence until <br />`'authorization has been given by the District Ranger. ' <br />• <br />... <br />(f) Aoad construction may be authorized by this Operating Plen <br />~~ ,. 'i <br />or by Special Use Permit if it is determined by the <br />"' ~ authorized officer that a permit is necessary or desirable. <br />~,~„ ' <br />(g) Disposal of salvageable timber and debris in the course of <br />' clearing operations will be in accordance with the following <br />agreement timber will not be requ;r d ;n rh;s nnorartnn SPA para. 93 ' <br />(specify plan for disposal) ' <br />vegetation 6 ova burdenwill be stockpiled for subse uent reclamation i <br />(h) Construction wil~ be on approved right-of-way locatoion with <br />maximum sustained grades not to 'exceed 12Z or as ' <br />(percent grade) <br />~'"" otherwise specified in FSH 7709.11 Transportation Engineering ' <br />i <br />~. Handbook, 52.1 through 82.4 0£ FSM 5613 and 7?'10-12 Rosd I <br />r• <br />Design Criteria. <br />• <br />(i) Drainage and erosion control measures that will be provided are: <br />Water bars and other drainage faciliites as needed <br />(specify kind of structures and interval of placement) <br />(~) Provisions for screening right-of-way and work sites will be <br />' in accordance with the following plan: native vegetation & <br />(preservation of native <br />'trees wilt be reserved as much as r <br />p possible to provide to screening <br />vegetation, leaving tree screens, other provisions for ecreaning <br />the operation). <br />• •. T. ~+~...... <br />. <br />~,'; , <br />