Laserfiche WebLink
<br />• EXHIBTi' L <br />Table U4. Summary of Reclamation Costs and Proposed Bond <br />Descri tion Item Cost <br />Disturbance Cost Total $267,068 <br />Contractor MOB/DEMOB 8.0% $21,365 <br />Overhead (18.5%) $49,408 <br />Administrative 5.0% $16,892 <br />Total Pro osed Bond $354,733 <br />Disturbed Acrea e Acres 49.50 <br />Bond Cost Per Acre $/acre $7,1G6 <br />