Laserfiche WebLink
• <br />RECLAMATION COSTS <br />• EXHIBIT L <br />Reclamation costs are broken down by Phase. If Lafarge defaults during Phase 3 <br />and no reclamation has been completed, all three Phases will need to be reclaimed. <br />The costs associated with each Phase are shown in Tables L-1, L-2 and L-3 <br />respectively. The total cost of reclamation and proposed bond is shown in Table L- <br />4. <br />Table Irl. Reclamation Costs for Phase 1 <br />Descri lion Unit Quanti Unit Price Item Price <br />Backfill Excavation CY 109,000 $1.25 $136,250 <br />Scar' AC 14.91 $100.00 $1491 <br />Place 12" to soil CY 5,000 $1.25 $6,250 <br />Seeding, Mulching, <br />Fertilizin AC 14.91 $750.00 $11,183 <br />Haul road removal SY 4520 $3.00 $13 549 <br />Total Cost $168,723 <br />Table Ir2. Reclamation Costs for Phase 2 <br />Descri lion Unit uantit Unit Price Item Price <br />Backfill Excavation CY 19,800 $1.25 $24,750 <br />Scari AC 4.53 $100.00 $4.53 <br />Place 12" to soil CY 7,308 $1.25 $9,136 <br />Seeding, Mulching, <br />Fertilizin AC 4.53 $750.00 $3,398 <br />Total Cost $37,736 <br />Table Ira. Reclamation Costs for Phase 3 <br />Descri lion Unit Quantit Unit Price Item Price <br />Backfill Excavation CY 21,000 $1.25 $26,250 <br />Scari AC 4.66 $100.00 $466 <br />Place 12" to soil AC 7,518 $1.25 $9,398 <br />Seeding, Mulching, AC 4.66 $750.00 $3,495 <br />Fertilizin <br />Demolition and disposal of SF 7000 $2.50 $17,500 <br />concrete flatwork <br />Demolition and disposal of LF 350 $10.00 $3,500 <br />foundation and footin s <br />Total Cost $60,609 <br />