My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE115514
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE115514
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:11:30 PM
Creation date
11/25/2007 12:57:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Permit File
Doc Date
9/12/2006
Section_Exhibit Name
Tab Introduction
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I~ current status and condition of the mine. Responses to various issues <br />which were raised were included in this submittal. <br />Technical Revision No. 21 <br />The purpose of this revision was to request approval for temporary <br />impoundments (stock tanks) in reclaimed areas and to abate NOV C-90-054. <br />Seneca intends to utilize these temporary impoundments as permanent <br />stock tanks in the future. The information provided in this revision <br />will establish the necessary data and procedures to be used in support <br />of a future request for permanent impoundments. <br />Technical Revision No. 22 <br />This revision requested construction of a separate, trapezoidal <br />emergency spillway channel in existing Pond 008 to comply with the <br />recent changes in the CMLRD regulations. The diversion system above the <br />pond was reevaluated and minor changes were proposed to it as well. <br />Technical Revision No. 23 <br />This revision was necessary to update the reclamation plan. Due to a <br />decrease in coal demand from the customer, mining activities have not <br />advanced as shown on the existing mine plan. Therefore, reclamation <br />activities have not progressed according to the reclamation plan. <br />Revisions were necessitated to the mine and reclamation plans to reflect <br />the change in customer demand for coal. Topsoil Stockpile JJ and the <br />current location of ramps into the pit were also revised. <br />Technical Revision No. 24 <br />This revision was submitted for approval of the as-built calculations <br />and drawings for Pond 008 to abate NOV C-92-018. <br />Technical Revision No. 25 <br />This request was for approval to install culvert Numbers 62 and 63. <br />Technical Revision No. 26 <br /> This revision was in response to the Division's adequacy concerns <br /> related to the second five-year renewal of Permit C-80-005. These <br /> responses addressed iss ues identified in the Divisi on's letters dated <br /> July 27, July 31, August 24, August 26, and September 9, 1992. <br /> TR-37 7 Revised 04/05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.