Laserfiche WebLink
XPAC Mining <br />• BUZ-92-1 TO PAR 6 BO22ARD (302) <br />HAUL CYCLE CALCULATION for CATERPILLAR 6l]8 SSR I85 II <br />Based on Payload o[ 37.5 O.S.tona (30.0 bey) <br />.PAC 9yetem - page 1 <br />2]-May-199] 15:63:52 <br /> tycle Average Nazimum Final Rolling Re strict ion3 <br /> Diet once Time Time Velocity Velocity Vel oe icy Grsde elev. Resist. Maximum Pinel Peyloed <br /> feat minutes \ mph mph mph a [set 4 mph mph 5 <br /> Queue st Loader 0.30 10.1 <br /> Spot at Loader 0.00 0.0 <br /> Loading 1.00 31.9 <br />1 Maul Segment 181.9 0.37 9.2 7.6 1f .9 11.9 0.0 0.0 4.0 Max Mez Pull <br />2 Haul Segment 171.1 0.14 4.6 19.2 16.6 10.8 -5 .3 -10.0 4.0 Max Max Pull <br />3 Heul Segment 72.7 0.10 l.5 ].9 10.3 9.0 I3 .9 10.1 4.0 Mex 5.0 Full <br /> Spot et Dump 0.20 6.3 <br /> Dumping 0.50 16.9 <br />4 Heul Segment 72.] 0.10 3.5 7.9 10.3 10.3 -13.9 -10.1 4.0 Mex Max Empty <br />5 Haul Segment 1]1.1 0.19 9.] 13.9 15.3 16.0 5.3 10.0 4.0 Mex Max empty <br />6 Haul Segment 181.9 0.20 6.7 10.5 16.0 5.0 0.0 0.0 4.0 Max 5.0 Bmpty <br /> Total 351.4 2.95 3.3 0.0 <br />• <br />('~~) . <br />