Laserfiche WebLink
%PAC Mining <br />BUZ-92-1 TO PAR fi BUZZARD (062) <br />Productivity Reaulce for Quick estimate <br />LOADING <br />Availability I9] 0.00 <br />Opexet ing Houre per Year fop.hra] 1800 <br />Operating Sh i[te per Yeai [eh itt a/year] 24D <br />Average Lond ing Time Irvin a] 1.00 <br />Na it Time per Ope r. Hour Irvine] 1.96 <br />Loading Methodology - Truck Positioning <br />Bucket Paeeea <br />Load ing Vn it Productivity <br />Per Oparat irtg Hour Ibry] 1595 <br />Per Shift (bcyl 11589 <br />Per Ye aZ Ibry] 2'160156 <br />HAULAGE UNIT <br /> G'fERPILLAR 631E <br /> SfiRIES ZI <br />Fleet Siie [numbs r7 3 <br />Average Avail ab it ity f91 95.00 <br />Opcrat ing Houre per Year lop.hre] 1800 <br />Nominal Payload [bcy) 30.0 <br />Average Payload [bry] 30.0 <br />Cycle Ave rages <br />Queue Time et Loader [mina] 0.30 <br />Spo[ Time at Loader Lmins) D.OD <br />Loading Time (mine] 1.00 <br />Travel Time Irv inel 0.95 <br />Spot Time at Dump [m iae] 0.20 <br />Dumping Time (mind] 0.50 <br />Total Cycle Time lmine] 2.95 <br />Haulage Vnit Produec ivity <br />Per Opernt ing Hour fbcy] 545 <br />Tyre 8ndursnce <br />Axle 1 ITMPH] 62 <br />Axle 2 fTMPH] 55 <br />Average Fuel Consumption fO.S.gale /op.hr 6.0 <br />FLEET ECONOMICS <br />Discounted Cep it al Coat [$/bry] D.OD <br />Discounted Operating CoeG I$/bcyJ 0.00 <br />Discounted Average Coat I$/bry] 0.00 <br />PAC System - Page 1 <br />2]-May-199] 15:93:98 <br />i <br /> <br /> <br />