Laserfiche WebLink
2-3 <br />=:1-li iF ANP WAkEH~ il..c=:E <br />A pair ,.f ad,i-'ir~ir~q t~uildir~gs will Ge Guilt <br />st~irage and sh~~p facilities. The warehouse <br />t~~ st %~re 3degU3te ~~ff tree shelf" supplies <br />Bul4- materials and those supplies which may <br />~~utside will either fe k:ept at the mines or <br />Figure =.~-'1'=: and :_:ecti~~r~ ~._.~.7. . <br />to pre~vide needed <br />will have tree capacity <br />to serve the mines. <br />rarely tie st~~red <br />in the supply yard (see <br />rr~e sr~c~p will pr~~vide ttie necessary ro~~rti for rt~air~tenar~ce of <br />equipment. <br />The warehouse is r,nt expected to ea-:ceed ~O` x 50'~, while the- shop <br />• ITi3y be 35 13r'~]e 35 1(Ifl' :?11', <br />WATER ~=Y:=;TEM <br />The availability of quality water on Salt Creek`s property is <br />exaremely limited. At present, water must Ge hauled t~~ the- mine in <br />3 t3n1: tr'UC{:: frGRi either the- McClave Canyon Mine or from a local <br />irrigation district with which :alt Creek: has a purchase agreement. <br />In the future, Salt Cree4; will acquire- water from the Mack: Pumping <br />Pipeline. A disn~ssion of water rights ami projected use is <br />contained in Section ~.~.~._. <br />• F'rinr to construction ..f the railroad, water will be trucked to the <br />mine. After railroad construction, the water will be Grr,ught to <br />the mine in rail hankers. The tanl::c-rs will discharge into a fresh <br />5/13/85 <br />