Laserfiche WebLink
~ • <br />DATE: October 21, 1997 <br />TO: Mr. William A. Ves 1 <br />FROM: Larry D. Oehler; En4ironmental Protection Specialist <br />RE: File No. M-97-064, Adequacy Items <br />C <br />The following items must be addressed by the applicant in order to satisfy the applicable requirements <br />of C.R.S. 34-32-101 et s~ And the Mineral Rules and Regulations of the Mined Land Reclamation <br />Boazd: <br />General <br />Your business is a Limited Liability Corporation. Does it have officers and a corporate seal or <br />separate tax ID number? If so, add them to your application. <br />2. Maps -Mining and Reclamation add the following - <br />A. Name of Applicant <br />B. Signature of the person that prepared the map <br />C. The date the map was prepared <br />Exhibit B -Site Description <br />The road that accesses the property is a permanent manmade structure within 200 feet of the <br />affected land. Please show it on the Exhibit E -Map. <br />2. Your location map shows the permit area to be adjacent to a live stream which possibly could <br />receive drainage directly from the affected azea. Please provide any available information on <br />flow rates and water quality for this stream, if it could receive drainage from the affected azea. <br />Exhibit C - Minine Plan <br />Please estimate when mining will cease. <br />2. Please estimate the depth to which topsoil will be salvaged on any previously undisturbed areas. <br />You must salvage available topsoil. Show on your mining plan map where you will stockpile <br />this material and describe in this section how you will stabilize it with a vegetative cover, <br />unless you p]an to place it in reclamation work immediately. The N.R.C.S. soil description you <br />provided shows approximately 2 inches of gravely loam surface layer and 25 inches of gravelly <br />clay loam substratum. <br />3. Will you be removing soil or rock material from above the deposit to be mined? If so, describe <br />each and show on your Exhibit E map where this material will be stockpiled or filled. Is there <br />-1- <br />