Laserfiche WebLink
condition of the highwall, stability of the <br />of surface features. For instance, SCC r <br />sedimentation structure even though surf <br />shown that wifl not be highwall mined due <br />Highwall Miner Ground Control Plan. <br />Rule 4.23.2 12) is being complied with e <br />workings within 500 feet of the proposed <br />In the interest of contemporaneous reclam tion for Rule 4.23.213), auger (highwall miner) mining will <br />be initiated and completed as soon as poss ble after the surface coal has been removed. The highwall <br />miner operations will be following the dragline stripping operations along the entire length of the final <br />highwalls as shown on Exhibit 12-3, 12-3a, and 12-36, Operations Plan. <br />I, condition and thickness of the coal seam, and location <br />leave a block of unmined coal beneath the Pond 016A • <br />subsidence is not expected. There are other areas as <br />coal seam conditions and characteristics presented in the <br />. since there are no abandoned or active underground <br />(highwall miner) operations. <br />For Rules 4.23.2(4) and 4.23.2151, special plugging procedures are not proposed for this set of auger <br />Ihighwall miner) holes. The holes will be plugged by backfilling operations as a normal part of the <br />highwall miner and reclamation operation Drainage from these holes will not be a problem as <br />discussed in the Hydrology Section. <br />For Rule 4.23.216) Id), subsidence re <br />buildings, or other surface facilities is <br />conducted by SCC. There are no stru <br />of draw of highwall mining. If cracks r. <br />them. As per accordance with the M' <br />minimum safety factor of 1.5. <br />ig from auger Ihighwall miner) mining to any powerlines, <br />predicted occur based on the engineering design analysis <br />s on areas overlying, or within a possible subsidence angle <br />i to highwall mining do occur on the surface SCC will repair <br />ground control plan, SCC will design pillar strength with a <br />• <br />Finally, Rule 4.23.2(71, requires that <br />with approved backfilling and grading <br />requirement is included in Tab 19. <br />2.0 GEOLOGY <br />Ihighwall miner) mining shall be conducted in accordance <br />~rements of Rule 4.14. A variance request to the 180-day <br />Site specific geology within and adjacent tq~ the permit area is presented in Tab 6 of the permit <br />application package. <br />Coal seams to be mined: Wadge, age Creek, and Wolf Creek <br />Wadge Thickness: 7' to 14' <br />Sage Creek Thickness 3'to 7' <br />Wolf Creek Thickness: 10' to 6' <br />Height of highwall: The highwall <br />depth encompassing the highwall <br />will vary from 30' to 150'. The maximum overburden <br />will be approximately 450 feet. <br />• <br />PR04 I 12-4-2 Revised 04/04 <br />