Laserfiche WebLink
• Permit Revision 05 -Mine Plan Update <br />It was originally projected that the Highwall Miner would move from the Yoast Mine to the II-W Mine in <br />2005 to begin recovery of the Wadge seam from beneath the Wadge seam highwall. However, the <br />Highwall Miner production lat Yoast in 2004) did not meet budgetary expectations. SCC and Peabody <br />Energy decided to eliminate further plans for highwall mining and the machine was removed from the <br />Seneca mine in December 2004 before all projected areas were mined. <br />SCC has no plans to continue with the following highwall miner plan or operations. <br />C <br />• <br />PR-05 Revised D5/05 <br />