Laserfiche WebLink
<br />' EXHIBIT "E" <br />' RECLAMATION PLAN <br />BLM PIT - WEST OF MAYBELL <br />1 <br /> (A) All backslopes will be graded to be no steeper than 3:1. Grading <br />' will be done in such a manner that the disturbed areas will blend <br /> with the surrounding contours. <br />' (B) The pit floor will be graded t o drain into the natural drainage <br /> in the area. <br /> (C) Soil overburden will be placed over the disturbed areas to a minimum <br />' depth of six inches. This mat erial will be graded and left in a <br /> smooth condition. <br /> (D) All disturbed areas w ill be se eded and fertilized as recommended by <br /> the Soil Conservation Service. Refer to attached sheet. <br />' (E) The haul road to the pit is to remain in place. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />