My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE114583
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE114583
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:10:41 PM
Creation date
11/24/2007 11:49:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984062
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
EXHIBIT 15 HYDROLOGIC MONITORING PLAN
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />• <br />;• <br />TABLE B <br />HYDI~LOGIC h13NITCRIN; PARAMETER LIST <br />Parameter <br />Water Level <br />Flow <br />Terp., field <br />pH, field <br />EC, field <br />TDS <br />TSS <br />SAR <br />Calcium, dis. <br />Magnesium, dis. <br />Sodium, dis. <br />Bicarbonate <br />Carbonate <br />Sulphate <br />Cadmium <br />Cadmium, dis. <br />Lead, dis. <br />Mercury <br />t4ercury, dis. <br />Selenium <br />Selenium, dis. <br />Silver <br />Iron <br />Iron, dis. <br />Manganese <br />Manganese, dis. <br />Molybdenum <br />hblybdenun, dis. <br />Zinc <br />Nitrate & <br />Nitrite <br />Prmonia, Free <br />Phosphate, ortho <br />Units <br />feet <br />cfs <br />deg. C <br />umihos/an at 25 C <br />mg/1 <br />mg/1 <br />ng/1 <br />mg/1 <br />mg/1 <br />m~./1 (HC03) <br />m5/1 (C03) <br />mg/1 <br />ug/1 <br />ug/1 <br />ug/1 <br />ug/1 <br />ug/1 <br />ug/1 <br />ug/1 <br />ug/1 <br />ug/1 <br />ug/1 <br />ug/1 <br />ug/1 <br />ug/1 <br />ug/1 <br />ug/1 <br />mg/1 (N) <br />Alluvial Spoil <br />Wells Wells Wells <br />S M Q <br />S M Q <br />S M Q <br />S M Q <br />S Q S <br />S <br />S <br />S <br />S <br />S <br />S <br />S <br />S <br />S <br />S <br />S <br />S <br />S <br />S <br />S <br />S <br />s <br />S <br />S <br />S <br />S Q S <br />S Q S <br />S Q S <br />S Q S <br />Surface(1) <br />4ater <br />Q <br />Q <br />Q <br />Q <br />Q <br />Q <br />Q.. . <br />Q <br />Spoil(1) <br />Springs <br />r~Q(2) <br />MgQ <br />MBQ <br />S <br />S <br />S <br />S <br />S <br />S <br />S <br />S <br />S <br />S <br />S <br />S <br />S <br />S <br />S <br />S <br />S <br />mg/1 (N) - Q S Q S <br />m9/1 S G s Q s <br />S =Semiannually either in April or May, and then in September or October <br />Q = Quarterly <br />M = Monthly <br />Note: <br />(1) kll trace metals are total recoverable. <br />(2) At time of annual survey, flaw and field parameters are measured. If <br />flow is greater than 35 gpm, site is monitored per spoil spring plan. <br />If less than 35 gpm, no further monitoring. <br />hR 90-10 <br />Ex. 15-8 <br />Revised G5/03/90 <br />
The URL can be used to link to this page
Your browser does not support the video tag.