My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE114583
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE114583
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:10:41 PM
Creation date
11/24/2007 11:49:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984062
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
EXHIBIT 15 HYDROLOGIC MONITORING PLAN
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />SITE <br />TABLE A <br />HYDROLOGIC MONITORING SITES <br />SURFACE FLOW, LEVEL, AND SPOIL SPRINGS <br />MONITORING FREQUENCY <br />Flow & Field Water Quality <br />Parameters Sampling <br />COMMENTS <br />SURFACE FLOW <br />Foidel Creek <br />USGS 09243900 Monthly Quarterly (2) <br />Middle Creek <br />USGS 09243700 Monthly Quarterly (2) <br />29 Monthly Quarterly (2) <br />• WATER LEVEL MEASUREMENT <br />304 Monthly - (1) & (3) <br />SPOIL SPRINGS <br />Spoil Spring(s) Quarterly Semiannually (4) <br />Note: <br />(1) Included with Twentymile Coal Company's hydrologic monitoring program. <br />If site is removed from TCC's program and continued monitoring is <br />required, CYCC will monitor the site. <br />(2) Sampling will be performed on a flexible schedule throughout the normal <br />flow period, March through September. Within this time frame, flow and <br />field parameters will be measured twelve (12) times and four (4) full <br />suite analyses will be conducted. <br />(3) Water level measurements collected from late March/early April through <br />September. Used to correlate with water level measurements of adjacent <br />alluvial well. <br />(4) At time of annual survey, flow and field parameters are measured. If <br />flow is greater than 35 gpm, a full suite analysis will be collected at <br />. the time of the survey and the site will be added to the spoil spring <br />plan. If less than 35 gpm, no further monitoring. <br />MR 90-10 Ex. 15-7 Revised 05/03/90 <br />
The URL can be used to link to this page
Your browser does not support the video tag.