Laserfiche WebLink
Area Description Acreage <br />1. Soil Stockpiles 0.5 <br />2. Processing area 6.0 <br />3. Product stockpile area 2.0 <br />4. Active Mining area (including overburden stripping, active pit, ramp roads) 24.1 <br />5. Fully reclaimed areas (part of lake fully backfiIled to grade and retopsoiled) 12.9 <br />6. Partially reclaimed areas (partially backfilled or graded) 28.0 <br />Total 73.5 <br />The highest production rates for the site are as follows: <br />Commodity Annual Production <br />Rate Maximum Comments <br />Sand and Gravel 250,000 tons/yr Average will be less <br />Asphalt 150,000 tons/yr Average will be less <br />Concrete None There will be no concrete plant on site <br />Gilsonite Pit 10/02 <br />