My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE114323
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE114323
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:10:27 PM
Creation date
11/24/2007 11:28:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983194
IBM Index Class Name
Permit File
Doc Date
11/15/1983
Doc Name
IRI NAHCOLITE SOLUTION MINE PROJECT FN 83-194
From
MRD
To
INDUSTRIAL RESOURCES INC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
•IIIIIIIIIIIIIIIIIII-- •_- <br />999 <br />dgEPARTMENT OF NATURAL RESOURCES- _ <br />[Held H_GNOhN, EaoevlNS Director - - - <br />MINE6LAND RECLAMATION DIVISION <br />DAVID C. SNEITON, [Nrootor <br />Rlthard D. Lamm <br />6o~ernor <br />November 15, 1983 <br />Mr. Edward C. Rosar <br />President <br />Industrial Resources, Inc. <br />300 Union Boulevard <br />Suite 520 <br />Lakewood, Colorado 80228 <br />Re: IRI Nahcolite Solution Mine Project, File No. 83-194 <br />Dear Mr. Rosar: <br />The Division has received your responses of November 9, 1983 regarding <br />the Division's correspondence of October 24, 1983. During the review of <br />your responses, some additional questions and comments were raised by the <br />Division. Please respond to the following three items in a timely <br />manner, prior to the December 15, 1983 Board meeting, to allow for review <br />of your responses by the Division. <br />A. Exhibit D - Mining Plan <br />The Division is very concerned with the moviny of the topsoil <br />stockpile from its current location next to the Bulk Sampling Plant to an I <br />area adjacent to pond No. 1. Pursuant to Rule b.4(c) of Rules and <br />~~y~ disturbances f~omoongoingkoperation wolbebeominimizedareAlsohepursuant to ~ <br />~~~s~ Rule 6.4(d) of the Rules and Regulations, any relocation of an existing ~ <br />~,+,~artopsoil stockpile requires Mined Land Reclamation Board approval. ~' <br />o~~ P"~Due to increasing from the Bulk Sampling Plant phase to the Pilot Plant <br />~,, ~ phase, the Division understands the necessity of moving the topsoil <br />~~ ~e stockpile and will recommend approval to the Board. However, the <br />rT~ Division requests assurance by the operator that this topsoil stockpile <br />,~~ ~~. will not have to be moved again in the future when the operation is <br />p~ phased up to a commercial size scale. If the topsoil stockpile does have <br />t~° to be relocated during the commercial phase, is it possible to locate the <br />pile in another location (that will not be disturbed) now instead of at a <br />future date? <br />C ~ ~~ ~ pt'- <br />~,~ K'' <br />P h <br />J~ <br />ISM <br />423 Centennial Building, 1313 :Sherman Street Denver, Colorado 80203 Tel. (303) 866-3567 <br />
The URL can be used to link to this page
Your browser does not support the video tag.