Laserfiche WebLink
1 <br />i <br />1 <br />i <br />i <br />1 <br />i <br />i <br />i <br />1 <br />1 <br />i <br />i <br />i <br />1 <br />1 <br />1 <br />1 <br />1 <br />4 <br />(e) Fertilize and Seed Area: <br />1) Fertilizer Cost estimated: $100 <br />2) Seed <br />6 1/2 lb./Ac. @ $4.27/lb. <br />X 10 1/2 Ac. $291 <br />3) Farm Tractor w/drill <br />4 hrs. @ $25 $100 <br />/3~~I1 <br />(,t) Alternate Stockpile Area: <br />(a) Replace Topsoil from Stockpile, Disc, <br />Harrow, and Smooth: <br />Since topsoil material (approximately 3,000 <br />cubic yards) will be stockpiled along the <br />west edge of the area, no trucks or front-end <br />loader is required. <br />(1) Replace Topsoil over Surface Area and <br />Smooth. <br />1 - D-8 Dozer <br />8 hrs. @ $9G/hr. $ 720 <br />(2) Disc and Harrow <br />1 - Facm Tractor w/Disc <br />2 hrs. @ $25/hr. $ 50 <br />3 <br />