Laserfiche WebLink
1 <br />1 <br />i <br />1 <br />1 <br />i <br />1 <br />i <br />i <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />(b) Removal of Machinery: <br />tachinery would normally be removed from the <br />site, and relocated elsewhere, therefore, <br />this is r,ot considered to be a cost item for <br />reclamation. <br />(c) Excavate Surface Area to Natural Topsoil: <br />This is included in item (a) above. <br />(d) Replace Topsoil from Stockpile, Disc, Harrow, <br />and Smooth Surface: <br />Estimated to approximate 3,000 cubic yards. <br />1 - Front-end Loader <br />24 hrs. @ $45/hr. _ $1,080 <br />2 - End dump trucks <br />48 hrs. @ $40/hr. _ $1,920 <br />1 - D-6 Bulldozer <br />4 hrs. @ $50 = $ 200 <br />1 - Cat 12 Patrol <br />4 hrs. @ $45/hr. _ $ 180 <br />1 - Farm Tractor <br />4 hrs. @ $25/hr. = S 100 <br />2 <br />