My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE114242
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE114242
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:10:23 PM
Creation date
11/24/2007 11:24:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984067
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
2.05 OPERATING AND RECLAMATION PLANS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
compliance with the Clean Air Act and the Colorado Pollution Act. Air <br />• pollution control measures are discussed in detail in Section 2.05.6. <br />2.05.5 Post-Hininq land Uses <br />The implementation of the detailed Reclamation Plan is contained in <br />Section 2.05.4 will restore the land affected by surface operations and <br />facilities within the permit area to the pre-mining use as undeveloped <br />land, This restoration will be specifically accomplished by grading the <br />area to create approximate original contour, restoration of drainage <br />patterns to their original function, application of mulch, followed by <br />the seeding of the seed mixture set forth in Section 2.05.4. Erosion <br />will be controlled on the newly seeded area through the use of mulch and <br />a drainage and sediment control plan until vegetation has been <br />sufficiently established. The lands will also be protected from noxious <br />weeds or other biological processes such as animal grazing until the <br />stands are sufficiently established to support projected use. <br />• The proposed land use as undeveloped land for the reclaimed area is <br />identical to the pre-mining land use found in the area. No change in <br />land use is expected in the proposed land use categories. Therefore, <br />the proposed land use will be consistent with the historic land use on <br />lands within the current permit area. <br />The consideration of undeveloped land with some wildlife habitat as the <br />post-mining land use is identical to the discussion in Section 2.04.3. <br />The limitations on changing to an alternative land use are fully <br />discussed in that Section. <br />Approval from existing state and local government units is not necessary <br />to restore the pre-mining land use because the post-mining land use will <br />be consistent with the pre-mining use as indicated earlier. <br /> The proposed post-mining land use is shown graphically on the Pre-Mining <br />• and Post-Mining Land Use Map (Map 9). ~Il,a 5..< lrs „I.cS S 6 A <br />2.05-36 'i~wn 1 S) 'i~f <br />
The URL can be used to link to this page
Your browser does not support the video tag.