Laserfiche WebLink
:. <br />-s- <br />Estimated Costs <br />9.5 Acres - Major Disturbance <br />Replace topsoil and overburden on shoreline <br />(110 b 112) 41,000 cy @ $.50/cy. 20,500.00 <br />Seeding, Mulching, Fertilization @ 230.20/A x 9.5 2,186.90 <br />4 Acres - Moderate Disturbance <br />Topsoil replacement 1633 cy/A x $.50/cy x 4A <br />hdd: SeaA:.y~ M,.l~l,:..y~Frrt. ed~.3o..1n/A % Y~A <br />5 Acres - Minor Disturbance <br />Seed 7.44k/A x $3.00/dk x SA <br />Drilling Seed $10.00/A x SA <br />Straw mulch 2T/A x $70/T x SA <br />Apply 6 crimp mulch $20/A x SA <br />Fertilizer - applied <br />40dk available N/A - $21/A x SA <br />40ik available P/A - $17/A x SA <br />10% State Administration Costs <br />I think this covers the concerns you raised <br />questions, please call me. <br />22,686.90 <br />3,266.00 <br />yao.~o <br />111.00 <br />50.00 <br />700.00 <br />100.00 <br />105.00 <br />85.00 1,151.00 <br />27,103.90 <br />2,710.00 <br />$29,813.90 <br />If there are other <br />Sincerely, <br />Z,C4' u"'r". "~ <br />/.~, <br />Bruce Cramb <br />General Manager <br />~aoa~r.7o <br />~ ~o~,.So <br />3 0 ~8a7, a o <br />Re..~ to <br />,~3 0~ 850, 0 0 <br />enclosure <br />BC /bd <br />