My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE114026
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE114026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:10:12 PM
Creation date
11/24/2007 11:13:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006085
IBM Index Class Name
Permit File
Doc Date
3/6/2007
Doc Name
Adequacy Review
From
DRMS
To
LJ Development
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Date : 06-Feb-2007 <br />User : BMK <br />Permit or job no.: M-2006-085 <br />Abbreviation : none <br />Filename : M085-000 <br />Site :Leone Garvel Pit #2 <br />State :Colorado <br />County :Las Animas <br />Agency or organization name :ORMS <br />Permit or job action :NEW 112 APPLICATION <br />TASK LIST (DIRECT COSTS) FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />001 -CUT SLOPES TO 3:1 dozer 1 50.0 $8,507 <br />002 -APPLY 61NCHES OF TOP SOIL dozer 1 218.0 $13,100 <br />003 -RENEGE 20 ACRES revege 1 65.0 $24,119 <br />004 -MOB/DEMOB mobilize 1 5.0 $550 <br />indudes inflatlon factor atljustment of <br />NA °/a <br />SUBTOTALS :~ 338.G <br />TOTAL DIRECT COST <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT <br />Liability insurance : 2.02 % of direct total = $935 <br />Performance bond : 1.05 % of direct total = $488 <br />Job superintendent : NA` NA NA total = NA <br />Profit : 10.00 % of direct total =-- $d8' <br />• not required (w eqp. operaforsenres as super) TOTAL O 8 P = $8,048 <br />LEGAL-ENGINEERING-PROJECT MANAGEMENT- CONTRACT AMOUNT (direct+08P)= $52,324 <br />Financial wartanty processing (legal/related casts) : 500.00 total $ NA total = $500 <br />Engineering work and/or contractlbid preparation : 4.25 % o/ cntr. NA focal = $2,224 <br />Reclama8on management and/or administration : 5.00 % of Intr. NA total = $2,616 <br />CONTINGENCY- NA' NA total= NA <br />• contingencies aaounkM ror at task level TOTAL INDIRECT COST = $11,388 <br />TOTAL BOND AMOUNT (direct + Indirect) _ $57,864 <br />
The URL can be used to link to this page
Your browser does not support the video tag.