Laserfiche WebLink
n <br />C <br />• 8. No water will be used in this Quarry operation. <br />9. No surface or ground water will be encountered at <br />this site. <br />10. Colorado Water Laws do not apply to this site. <br />11. The extracted marble material will be transported <br />to Salida and the Hutala Construction aggregate pro- <br />cessing facility. It is anticipated that a portable <br />screening operation may occur on the overburden bench <br />sites. This screening will be for sizing of material <br />for transport. Discarded material will be deposited <br />in the overburden bench area. <br />u <br />