My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE113902
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE113902
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:10:05 PM
Creation date
11/24/2007 11:06:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999098
IBM Index Class Name
Permit File
Doc Date
12/8/1999
Doc Name
M-99-089 CAMAS COLO INC
From
WAYNE L & JOYCE A DAWSON
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ • iii iuiiiiiiiiu iii <br />999 <br />~F_CFIVFD <br />Wayne L. & Joyce A. Dawson <br />30878 Rocky Road <br />Greeley, Colorado 80631 <br />i)rC 1SS9 <br />~lIVISIOn of N'~inerais 6 tieofo9Y <br />December 8, 1999 <br />Cazl Mount <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />RE: M-99-089 (Camas Colorado, Inc.) <br />Dear Mr. Mount, <br />We own property that will be surrounded by the mining operation if this permit is <br />issued. When we purchased ow property in 1994 we looked forwazd to living in a quiet <br />peaceful country setting. We did not dream that a gravel pit would be going in atl the way <br />azound us. <br />We would like to go on record as being opposed to this proposed permit. <br />There aze several errors that we have found in the reclamation plan.. # 1. The <br />homes and outbuildings aze not correctly located and there are no notations regazding <br />fences. #2. Rocky Road which is in the center of the residential area is incorrect <br />according to the scale on the map. #3. Only one drain file is idenliSed on this map. We <br />have located several other tiles. Some of them aze located within the proposed mining cells <br />(see attached map). Also see attached recorded agreement concerning the drain tile. <br />#4. The topography of the land in the upper portion of Cell Z can not be used for water <br />storage as shown on the map without building a 15 foot dike at the south end. We have <br />been told by Camas representatives that they will not build this above the present ground <br />level. If they do not plan on putting a high dike here, the top part of this lake can not have <br />any water in it and it will be nothing but a big hole. How can we feel comfortable with this <br />plan, when we know there aze several errors? <br />We have several permanent manmade structwes that aze located within the 200 feet <br />of the proposed mining operation. Camas has not approached us to make the required <br />agreement concerning damage to these structwes. To ow knowledge, they have not <br />obtained an engineering evaluation of these structwes either. We would hope that one or <br />the other these would be required before this proposed permit is considered for issuance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.