My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE113898
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE113898
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:10:04 PM
Creation date
11/24/2007 11:06:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012A
IBM Index Class Name
Permit File
Doc Date
3/20/2006
Section_Exhibit Name
Exhibit 28 Bond Calculations ā(TR48)ā
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />I⢠<br />r1 <br />\J <br />PROJECT IDENTIFICATION <br />Task description : Regrade West Poi-tal Containment Area 2 <br /> <br />HOURLY EQUIPMENT COST ., <br /> Basic machine :Cat D9R - 9SU Horsepower : 405 <br /> Blade iype :Semi-Universal <br /> Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 :1-shank ripper <br /> Data source : (CRG) <br /> Utilization °h <br />Cost Breakdown : Ownership cosUhour : $51.66 NA <br /> Operating costmour : $93.54 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cosfJhour : $31.76 NA <br /> Total unit cosUhour : $176.97 Total fleet rbstlhour : $176.97 <br />Task # : 049 State :Colorado <br />Date : 02/07/2005 County :Las Animas <br />User : JRS Site :New Elk Mine <br />Agenq or organization name :Colorado Division Of Minerals And <br />Permit or other job action :2005 Bond Recalculation <br />MATERIAL OUAN7ITIES <br />Initial Swell Loose <br />volume : 3,340 CCY fador : 1.125 volume : 3,758 LCY <br />Source of estimated volume :Exhibit 19; Division Estimate <br />Source of estimated sweA fador :CAT Handbook <br />Average push distance : 100 feet <br />Unadjusted hourly producbon : 1,243.2 LCY/hr <br />Matedal consistency description <br />Compacted fill or embankment <br />Average push gradient <br />Average site attihrde <br />Material weight <br />Weight description <br />Decomposedrock - 25% Rock, <br />0.00 % (pos) <br />7,500 feet <br />2,650 Ibs/LCY <br />75% Earth <br />JOB TIME AND COST <br />. Fleet size : 1 Dozers) <br />Untt cost : $0.366 /LCY <br />Operator skill <br />Material consistency <br />Dozing method <br />vsibilily <br />Job efficiency : <br />Spoil pile <br />Push gradient <br />Altitude <br />Matedal weigh <br />Blade type <br />Net correction <br />Adjusted unit production <br />Adjusted fleet production <br />PermNob# : G1981-012 <br />Abbreviation :none <br />Filename : C012-049 <br />Total job time <br />Total job cost <br />0.75 <br />0.90 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />0.87 <br />1.00 <br />Source <br />483.43 LCY/hr <br />483.43 Lcv/nr <br />7.77 Hours <br />E'xlnrb~fi z8-SY !_Zm-et <br />
The URL can be used to link to this page
Your browser does not support the video tag.