My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE113898
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE113898
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:10:04 PM
Creation date
11/24/2007 11:06:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012A
IBM Index Class Name
Permit File
Doc Date
3/20/2006
Section_Exhibit Name
Exhibit 28 Bond Calculations (TR48)
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimation Software <br /> <br />_ PROJECT IDENTIFICATION <br />Task # : 02S <br />Date : 028)8/1005 <br />User: JRS <br />State :Colorado <br />Ccunty :Las Animas <br />Site :New Elk Mine <br />Permitfjob # :G1981-012 <br />Abbreviation :none <br />Filename : C012-025 <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or other job action :2005 Bond Recalculation <br />Task description :Rip Prep Pfant Area Prior to Regrading <br />HOURLY EQUIPMENT COST <br /> Basic machine :Cat D9R - 9SU Horsepower : 405 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> Attachment rro. 2 :1-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $51.70 NA <br /> Dozer operating cosUhour : $93.54 100 <br /> Ripper operating cosUhour : 511.28 100 <br /> Operator cosUhour : $31.76 NA <br /> Total unit cost/hour : $188.26 Total fleet costAwur : 5564.78 <br /> <br />MATERIAL QUANTITIES =::: <br />• Selected estimating method . Area <br />Alternate methods - <br />Seismic : NA NA Load factor : NA Bank volume : NA BCY <br />Area : 5.37 <br />acres Rip depth (R) <br />Source of estimated quantity <br />Source of estimated load factor <br />HOURLY PRODUCTION <br />Alternate methods - <br />Seismic : Seismic velocity <br />Unadjusted production <br />Area : Avg. ripping depth <br />Average ripping width <br />Average ripping length <br />Average dozer speed <br />Average maneuver time <br />Production per unft area <br />Unadjusted production <br />11 <br />NA feeUsecond <br />NA cu. yds.lhour <br />4.05 feeUpass <br />8.08 feeUpass <br />200.00 feet/pass <br />88.00 feeUminule <br />0.25 minuteslpass <br />0.864 acres/hour <br />4,338.18 a. yds./hour <br />Site alt@utle : 7, 500 feet <br />Attitude adjustment : 1.00 (Cat HB) <br />Job efficiency factor : 0.83 (1 shiN/day) <br />Net job cortection : 0.83 multiplier <br />Adjusted unit production : 3,600.87 cu. yds./hour <br />Adjusted fleet production : 10,802.02 w. yds./hour <br />B TIME AND COST <br />. Fleet size : 3 dozers) Total job lime : 1.60 hours <br />Unit cost : 50.052 per cu. yd. Total job cost : $906 <br />~,tLi rbtt~ Z $ -y0 ~-zD -06 <br />
The URL can be used to link to this page
Your browser does not support the video tag.