Laserfiche WebLink
CIRCES Cost Estimating Software <br />• <br />Task # <br />Date <br />User <br />PertnrVob # : G1981-012 <br />Abbreviation :none <br />Filename :C012-024 <br />Agency or organization name :Colorado Division O/Minerals And Geology <br />Permit or other job action :2005 Bond Recalculation <br />Task description : RJp Wedge Area PrJor to Regred/ng <br />HOURLY E QUIPMENT COST <br /> Basic machine : Cat D9R - 9SU Horsepower : 405 <br /> Blade type : Semi-Universal <br /> Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 : lshank ripper <br /> Data source : (CRG) <br /> Utilization <br /> Cost Breakdown : Ownership coslRtour : $51.70 NA <br /> Dozer operating cosUhour : $93.54 100 <br /> Ripper operating cosUhour : $11.26 100 <br /> OperatorcosUhour: $31.76 NA <br /> Total and cosUhour : $188.26 Total fleet cosUhour : $584, 78 <br />• MATERIAL QUANTITIES <br />Selected estimating method . <br />Area <br />Ademate methods - <br />Seismic ; NA NA Load factor : NA Bank volume : NA BCY <br />Area : 1.60 acres Rip depth (ft) : 200 Volume : 5,163 BCY or CCY <br /> <br /> Source of estimated quantity :Map 11 <br /> Source of estimated load factor :NA <br /> <br />HOURLY PRODUCTION <br />Ademate methods - <br />Seismic : Seismic velocity : NA feeUsecond <br />Unadjusted production : NA cu. yds./hour <br />11 QVIVIJ - <br />Unadjusted production <br />per selected method : 4,338.16 cu. yds./hour <br />Area : Avg. ripping depth : 4.05 feeUpass Site altitude : 7,500 feet <br />Average ripping width : 6.08 feeUpass Altitude adjustment : 1.00 (Cat HB) <br />Average ripping length : 200.00 feeUpass Job efficiency factor : 0.83 (1 shilUday) <br />Average dozer speed : 88.00 feeUminute Net job correction : 0.83 multiplier <br />Average maneuver time : 0.25 minutes/pass <br />Production per unlt area : 0.664 acresrtrour Adjusted unit production : $600.67 cu. yds./hour <br />Unadjusted production : 4,338.16 w. yds./hour Adjusted flees production : 10,802.02 ce. yds./hour <br />JOB TIME AND COST~~~ ~ ~ ~ ~ ~ ~ -~ ~ ~~~ ~ -- ~~~~ ~~ ~ -~ ~~ " <br />• Fleet size : 3 dozers) Total job time : 0.48 hours <br />Und cost : $0.052 per cu. yd. Total job cost : $270 <br />024 State : Colomdo <br />02/082005 County :Las Animas <br />JRS Site :New Elk Mine <br /> <br />