Laserfiche WebLink
D. Equipment and Vehicles. Describe that which is proposed for use in your operation (Examples: <br />drill, dozer, wash plant, mill, etc.). Inchrde: sizes, capacity, fi~equency of use, exc. <br />E. Structures. Include information about faced or portable structures or facilities planned for the <br />operation Show locations on the map. Include such things as living quarters, storage sheds, <br />mHl buildings, thickener tanks, fuel storage, powder magaziues, pipelines, water diversions, <br />hailers, sanitation facilities including sewage disposal, etc. Include engineering design and <br />geotechnical information for project facilities, justification and calculations for sizing of tanks, <br />pipelines and water diversions, etc. <br />Personnel will camp on. or near the site. All Qersonnel will practice minimal-impact camping. <br />All refuse will be removed from site to a sanitary IandfilL <br />Personnel wr111eave the site daily to Cake care ofpersonal sanitation needs: otherwise. human <br />V. EIWIRONMENTdZ PRO:I'ECTIONMEASURES (3EE 36 CFR 2288) <br />A. Air Quality. Describe measures proposed to minim;~e impacts on air quality such as obtaining a <br />burmnQ permit for slash disposal or durst abatement on roads. <br />(Ifmore spare is needed to fill nut a block ofirtforarration, use additional sheets and attach to farm) <br />Tire remaining 20 % wffi be completed by a rubber-tired back hce or smaller track hoe such as a <br />Cat El lOB. A D-6 bulldozer maybe used for some reclamation work,, approximately 3 days. <br />Operations will normall~be continuous for one session a season_ approximately 40 days. but not to <br />covera¢e is reestablished. <br />to complete reclamation. <br />