Laserfiche WebLink
C. Project Description. Descnbe all aspects of the operation including mining, milling, and <br />exploration methods, materials, equipment, workforce, construction and operation schedule, <br />power requireme~s, how clearing will be accomplished, topsoil stockpile, waste rack <br />placement, tailings disposal, proposed number of dnll holes and depth, depth of proposed <br />suction dredging, and how gravels will be replaced, etc. Calculate production rates of ore. <br />Include justification and calculations for settling pond capacities, and the size of runoff diversion <br />channels. - <br />considered pzart of this operations plan. <br />(If more space is needed to fill out a block of information, ase adr&tional sheets and attach to form. ) <br />used for some reclamation and re-contouring of excavation and prospect sites.. <br />No constucion is p~posed No power is needed <br />Operations will be intermittent and based on weather and seasonal conditions. <br />Mechanized equipment wi11 be used for a maximum of 60 dates in any one season of approximateiv <br />hillsides and slow erosion. Trees will be replanted as~art of reclamation efforts. <br />from the minerals. <br />