My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE113830
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE113830
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:10:01 PM
Creation date
11/24/2007 11:02:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
NH2 1996 Section 2.05.3(6)(a) Overburden Blasting
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
All blasting will be conducted between sunrise and sunset at times and at locations defined in the <br />published blasting schedule. Unscheduled blasts would be conducted only where public or <br />operator health and safety so require and for emergency blasting actions described in the blasting <br />schedule. <br />The blasting schedule will identify as accurately as possible the location of the blasting site and <br />the time periods when blasting will occur. The blasting schedule will contain at a minimum: <br />a. Identification of the specific areas in which blasting will take place. The specific <br />blasting areas described will not be larger than 300 acres and will be reasonably <br />compact; <br />b. Dates and times when explosives are to be detonated; <br />c. Methods to be used to control access to the blasting area; <br />• d. Types of audible warnings and all clear signals to be used before and after <br />blasting; <br />e. A description of possible unavoidable hazardous situations when it may be <br />necessary to blast at times other than those described in the schedule. <br />WFC will publish a blasting schedule in the San Miguel Basin Forum which is the newspaper <br />having general circulation in the area in which the mining complex is located. The blasting <br />schedule will be published every twelve months and at least ten days, but not more than 20 days <br />before beginning blasting whenever the area covered by the schedule changes or whenever <br />periods for blasting significantly differ from the prior announcement. See Attachment 2.05.(6)(a)-1 <br />for example. If the change is temporary in nature, local governments and individuals to whom the <br />original schedule was sent shall be notified by telephone or personal contact followed by written <br />• (Revised 12-07-99) 2.05.3(8)(a) 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.