Laserfiche WebLink
<br />CIRCES Cost Estimating Software <br />COMPACTION WORK <br /> <br /> <br />Agency or organization name : DMG <br />Permit or other job action :new application reclamation cost estimate <br />Task description :compact backfili in pond separator dikes <br />HOURLY EQUIPMENT COST <br />Machine description : CA7 825G <br />Horsepower: 315 <br />PROJECT IDENTIFICATION <br />Task # : 011 <br />Date : 14-Aug-2001 <br />User : LDO <br />State :Colorado Permit/job # : M-2001-051 <br />County : Lanmer Abbreviation :none <br />Site :North Ta/t Hill Expansion Site Filename : M051-011 <br />Shift basis : 1 per day <br />Compactor type :Reclamation <br />Utilization % Data source : (CRG) <br />Cost Breakdown : Ownership cosUhour : $70.99 NA <br />Operating cosUhour : $60.72 100 <br />Operator cosUhour : $2755 NA <br />Total unit cosUhour : $159.26 Total fleet cosUhour : $159.26 <br />MATERIAL QUANTITIES <br />Loose Shrinkage Compacted <br />volume : 132.188 LCY factor : 0.800 volume : 105,750 CCY <br />Source of estimated volume :exhibit E <br />Source of estimated shrinkage factor :cat handbook <br />HOURLY PRODUCTION <br />Unadiusted hourly Droduction = (W x S x L x Cl / P <br />Compacted width per pass (W) : 738 feet <br />Average compactor speed (S) : 2.00 mph <br />Compacted thickness of each lift (L) : 12.00 inches <br />Conversion constant (C) : 16.3 (5,280 ft./12 in./27 cu.tt.) <br />Required number of machine passes (P) : 2 passes <br />Unadjusted hourly unit production : 1,443.53 CCY/hr <br />Job Condition Correction Factors Source <br />Site altitude : 5,020 feet Altitude adjustment factor: 1.00 (Cat HB) <br /> Job efficiency factor : 0.83 (1 shiR/day) <br /> Net jab correction : 0.83 multiplier <br /> Adjusted hourly unit production : 1,198.13 CCY/hr <br /> Adjusted hourly fleet production : 1,198.13 CCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 compactor(s) Total job time : 88.26 hours <br />Unit cost $0.133 per CCY Total job cost : $14,057 <br />