My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE113787
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE113787
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:09:59 PM
Creation date
11/24/2007 10:59:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001051
IBM Index Class Name
Permit File
Doc Name
CIRCES COST ESTIMATING SOFTWARE SCRAPER TEAM WORK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />State :Colorado <br />County : Larimer <br />Site : Norih Taft Hill Expansion Site <br />CIRCES Cost Estimating Software <br />COMPACTION WORK <br />PROJECT IDENTIFICATION <br />Task # : 010 <br />Date : 14-Aug-2001 <br />User: LDO <br />Agency or organization name : DMG <br />Permit or other job action :new application reclamation cost estimate <br />Task description :compact pond bank slope backlill <br />HOURLY EQUIPMENT COST <br /> <br />Permit/job # : M-2001-051 <br />Abbreviation :none <br />Filename : M051-010 <br />Machine description :CAT 825G <br />Compactor type :Reclamation <br />Horsepower: 315 <br />Shift basis : 1 per day <br />Utilization % Data source : (CRG) <br />Cost Breakdown : Ownership cost/hour : $70.99 NA <br />Operating cosUhour : $60.72 100 <br />Operator cost hour : $2755 NA <br />Total unit cosVhour: $159.26 Total fleet cosUhour: $159.26 <br />MATERIAL QUANTITIES <br />Loose Shrinkage Compacted <br />volume : 132,656 LCY factor : 0.800 volume : 106,125 CCY <br />Source of estimated volume :exhibit E <br />Source of estimated shrinkage factor :cat hndbk <br />HOURLY PRODUCTION <br />Unadjusted hourlyproduction = fW x S x L x C)_/ P <br />Compacted width per pass (W) : 738 feet <br />Average compactor speed (S) : 2.D0 mph <br />Compacted thickness of each lift (L) : 72.00 inches <br />Conversion constant (C) : 16.3 (5,260 tt./12 in./27 cu.tt.) <br />Required number of machine passes (P) : 2 passes <br />Unadjusted hourly unit production : 1,443.53 CCY/hr <br />Job Condition Correction Factors <br />Site altitude : 5,020 feet <br />Source <br />Altitude adjustment factor : 7.00 (Cat HB) <br />Job efficiency factor : 0.83 (1 shift/dayJ <br />Net job correction : 0.83 multiplier <br />Adjusted hourly unit production : 7,198.73 CCY/hr <br />Adjusted hourly fleet production : 1,198.13 CCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 compactor(s) Total job time : 88.58 hours <br />Unit cost 30.733 per CCY Total job cost : $14,106 <br />
The URL can be used to link to this page
Your browser does not support the video tag.