Laserfiche WebLink
2 03.8 Permit Te I tform ti n <br />~, <br />In the late summer and fall of 1993, the mine was reclaimed according to the plans in <br />the approved permit. A Phase ]bond release meeting was held on the site on October <br />24, ]995. Phase 1 bond release was granted in the 1st quarter of 1996. <br />The disturbed area and the final reclamation configuration is shown. on Final Contour <br />a ~ located in Section 2.05.4(2)(c) of the Reclamation Plan. The updated breakdown <br />of the disturbed area as of the end of 1995 is given below: <br />Total disturbed area: 4.96 acres <br />Areas within total area but not part of reclamation plan <br />County Road = 0.40 acres <br />Road Cut = 0 44 acres <br />Subtotal = 0.88 acres <br />Areas within reclaimed area but not to he included in the revegetation studies <br />Access Road = 0. ] 5 acres <br />• Sediment Pond = 0.24 acres <br />Bui]dinQ and Pad = 0.12 acres <br />Subtotal = 0.51 acres <br />Areas within the total area which were reclaimed and will be studied for reve elation <br />Yard Area = 2.36 acres <br />URper bench. reclaimed portal sloge and reclaimed office area slgpe = l 2] acres* <br />Subtotal = 3.57 acres <br />* Due to falling rock from the highwall remnant, this acreage for revegetation study <br />may be reduced at a later date. <br />Permit Reneu~ol 3 /1,'97 P <br />