My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE113581
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE113581
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:09:47 PM
Creation date
11/24/2007 10:46:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997089
IBM Index Class Name
Permit File
Doc Date
1/28/1998
Doc Name
RATIONALE FOR APPROVAL RECOMMENDATION REGULAR 112 CONSTRUCTION MATERIALS APPLICATION DAREN STONE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. <br /> <br />Rationale for Approval Recommendation <br />Application for Stone Gravel Pit <br />Permit No. M-97-089 <br />3. Exhibit D -- Mining P/an -- is inadequate <br />a. Timetable far units / - /V do not address protection/study of cultural sites <br />b. Timetable for mining units beyond unit lV are absent <br />c. /dentification/description of intended use of incidental products is absent <br />d. Plan for cultural arii(acis, as expected incidental products, is absent <br />e. Total pit depth is unknown <br />f. Total height of overburden and topsoil piles are unknown <br />g. Size of trucks utilized is unknown <br />Page 4 <br />IMPC, Stills) <br />/Sri//sJ <br />(Sri//s/ <br />/Sri//s/ <br />/Stills/ <br />IMPC) <br />/MPCI <br />(MPCJ <br />Response - 3.a. and b. -Rule 6.4.41e), states that the purpose of the approximate <br />timetable is to establish the relationship between mining and reclamation during the <br />different phases of the mining operation. The applicant has committed to <br />contemporaneous reclamation, which clarifies the relationship between mining and <br />reclamation. <br />Timetables within the application approximate eighteen months required for completion of <br />mining and reclamation for Units I -III and the four acre stockpile/processing area <br />(approximately 13.36 total acres). <br />(18 months) / (13.36 acres) = 1.35 months to complete mining and reclamation per acre <br />Based on the relationship of 1.35 months/acre for completion of mining and reclamation, <br />the timetable of the application may be continued as follows: <br />UNIT NUMBER UNIT TIME REQUIRED <br />Commence Date ACREAGE FOR COMPLETION <br />Unit IV -beginning 3/1999 4.37 acres 14.37 acl ' 11 .35 months/ac) = 6 months <br />Unit V -beginning 9/1999 5.16 acres (5.16 ac) ' 11 .35 months/acl = 7.months <br />Unit VI -beginning 4/2000 5.85 acres 15.85 acl ' 11 .35 months/acl = 8 months <br />Unit VII -beginning 12/2000 6.54 acres (6.54 acl ' 11 .35 months/acl = 9 months <br />Unit VIII -beginning 9/2001 6.72 acres 16.72 ac) ' (1 .35 months/acl = 9 months <br />Unit IX -beginning 6/2002 6.54 acres 16.54 acl ' (1 .35 monthslac) = 9 months <br />Unit X -beginning 3/2003 5.16 acres 15.16 acl ` 11 .35 months/acl = 7 months <br />Unit XI -beginning 10!2003 5.41 acres 15.41 acl ' (1 .35 months/acl = 7 months <br />Unit XII -beginning 512004 4.48 acres 14.48 acl ' 41 .35 months(acl = 6 months <br />Unit XIII -beginning 11/2004 4.82 acres 14.82 ac) ' 11 .35 months/acl = 7 months <br />Unit XIV -beginning 6/2005 5.68 acres 15.68 acl ' 11 .35 months/acl = 8 months <br />Unit XV -beginning 212006 5.51 acres 15.51 acl ' 11 .35 months/ac) = 7 months <br />
The URL can be used to link to this page
Your browser does not support the video tag.