Laserfiche WebLink
-4- <br />~• Stipulation No. 10 <br />THE DIVISION DIRECTS DORCHESTER COAL COMPANY TO MONITOR THE LOCATION AND <br />ORIENTATION Of THE THOMPSON RANCH STRUCTURES. THE APPLICANT SHALL <br />SURVEY THESE STRUCTURES ON A QUARTERLY BASIS. <br />Stipulation No. 11 <br />THE DIVISION DIRECTS DORCHESTER COAL COMPANY TO SUBMIT A PROPOSED REPORT <br />FORMAT FOR THE REQUIRED SEMI-ANNUAL SUBSIDENCE MONITORING REPORT, WITHIN <br />120 DAYS FOLLOWING PERMIT APPROVAL. THIS REPORT FORMAT SHALL INCLUDE <br />TABULATED SURVEY MONUMENT AND STRUCTURE LOCATION AND ORIENTATION DATA. <br />SURVEY DATA FOR THE TWO HIGH-RESOLUTION MONUMENT GRIDS SHALL ALSO BE <br />PRESENTED GRAPHICALLY, IN CROSS-SECTION FORM. THE SUBSIDENCE MONITORING <br />MAP SHALL BE AMENDED TO INCLUDE MONUMENT IDENTIFICATION LABELING, IN <br />ORDER TO FACILITATE DATA REPORTING ANO ANALYSIS. FINALLY, EACH <br />SEMI-ANNUAL SUBSIDENCE MONITORING REPORT SHALL INCLUDE A SUMMARY <br />COMPARISON OF MONITORING RESULTS AND THE APPLICANT'S PREDICTIONS FOR <br />EACH INVENTORIED STRUCTURE AND THE STREAM CHANNEL OF NEWLIN CREEK. <br />• <br />:• <br />