Laserfiche WebLink
<br />pesticide applicator. <br />9. To prevent the introduction of noxious weeds, all equipment must be cleaned before it <br />is brought in the project area. <br />10. A mining and reclamation plan needs to be submitted as part of the permit, and <br />shall be complied with. Any changes to [he plan aze subject [o approval by the White <br />River Field Office Manager. <br />11. No excavation within 50 feet of pipelines. <br />12. The mined area to be re-contoured to the Field Manager's specifications. The site <br />shall be re-shaped to gentle sloping surfaces avoiding straight lines and flat surfaces. <br />No slopes shall be steeper than 3:1. Re-contouring, furrowing, ripping and seeding <br />will be done progressively in conjunction wi[]r the excavation of the material. <br />14. To verify the amount of material removed, an initial and final survey of the pit will <br />performed by the operator and submitted to the White River Field Office. <br />15. To help prevent sediment transportation into the river drainage best management <br />practices will be used to control erosion. <br />16. Submit to the White River Field Office an annual report of the amount of material <br />that has removed from the Baxter Pit. <br />7 <br />