Laserfiche WebLink
RULE 6.34.(2) EXHIBIT "D" <br />RECLAMATION COST <br />AZCO PIT <br /> QTY. UNIT UNIT COST EXTENDED COST <br />1.) REDUCE REMAINING HIGH WALL 1 LS $1,250.00 $1,250 <br />2.) REPLACE OVERBURDEN 2000 LCY $0.75 $1,500 <br />3.) PLACE TOPSOIL OVER AREA 4500 LCY $0.75 $3,375 <br />4.) SCARIFY THE HARD PAN 3 ACRE $250.00 $750 <br />6.) SEED BED PREPARATION 9.9 ACRE $125.00 $1,238 <br />6.) FERTiLiZER APPLICATION 0 ACRE $0.00 $0 <br />7.) SEEDING BROADCAST METHOD DOUBLE THE RATE W/ LABOR & EQUIP. 9.9 ACRE $288.00 $2,851 <br />8.) MULCHING W/ MAY OR STRAW 4.5 ACRE $165.00 $743 <br />9.) WEED CONTROL ALLOWANCE 3.9 ACRE $35.00 $137 <br />10.) MOBILIZATION & DEMOBILIZATION 2 EA. $925.00 $1,850 <br />TOTAL DIRECT COST $13,693 <br />INDIRECT COST <br />PUBLIC LIABILITY INSURANCE 1.55% $212.24 <br />CONTRACTOR PERFORMANCE BOND COST 1.55% $212.24 <br />CONTRACTOR PROFIT 10.00% $1,369.27 <br />DIVISION OF MINERALS & GEOLOGY ADMIN. EXPENSE 5.00% $684.64 <br />ADDITIONAL SUPERVISION 3.00% $410.78 <br />TOTAL PERFORMANCE BOND AMOUNT $16,582 <br />