Laserfiche WebLink
A low earthen berm will be established to keep all stormwater on-site; this <br />will minimize disturbance to the hydrologic balance, and prevent off-site <br />damage. This will be maintained during active mining. The low earthen berm will not <br />be removed after all mining is complete. This will help provide a stable configuration <br />consistent with the surrounding topography. <br />EXHIBIT D <br />RECLAMATION COST ESTIMATE <br />RULE 6.34(2) SEE NEXT PAGE <br />