Laserfiche WebLink
CIRCES Cost Estimatino Software <br />COST SUMMARY FORM <br />Date : QO-,4ag-P691 g~y1lo y Permit or job no.: C-1981-012 Site :New Elk Mine <br />User : JHB Abbreviation : none State :Colorado <br />Filename : C012-~'~to.- County :Las Animas <br />Agency or organization name : Ccoooredo Division Of Minerals And Geology <br />Permit or job action :2001 Midterm <br />• <br /> <br />TASK ,. <br />LIST (DIRECT COSTS( <br />FORM <br />FLEET <br />TASK <br />DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />Ola -Demolition and disposal of structures demolish 2 100.0 $233,141 <br />01 b -Demolition and dispose/ of structures demolish 2 100.0 $376,144 <br />003 -Seed 89 ac. tacit. area; rangeland mix revege 1 89.0 $76,480 <br />004 -Seed, mulch, transplant 10.27 ec. ripaartan habitat revege 1 10.5 $38,209 <br />005 -Seed, mulch, transplant shrubs on 31.75 acres revege 1 31.7 $173,515 <br />037 -Seed 8 mulch 1.94 acres topsoil borrow area; rangeland mix ravage 1 1.9 $1,878 <br />01 c -Demolition and disposal of structures and culverts demolish 2 75.0 $91,563 <br />01 d -Demolish and dispose of culverts and structures demolish 1 90.0 $58,560 <br />010 -Haul SW coal stockpile footprint tto Bevel. waste pile truck/ 1 10.9 $6,593 <br />l0a -Haul SE coal stockpile footprint to Bevel. waste pile truck/ 1 17.91 $10,705 <br />10b -Haul NE coal stockpile footprint to Bevel. waste pile truck/ 1 13.5 $8,261 <br />10c -Haul raw coal storage footprint to Bevel. waste pile truck/ 1 13.7 $8,386 <br />10d -Haul clean coal stockpile footpdnt to Bevel. waste pile truck/ 1 17.6 $10,768 <br />007 -Seal shaft Collarand Seals mineseal 1 20.0 $12,582 <br />012 -Haul topsoil from entrance stockpile to DWP lruckf 1 10.1 $6,039 <br />13a -Haul 8 spread 30.097 cy cover material from RDA to DWP truck/ 1 79.2 $59,395 <br />13b -Rip material for 3.5' cover on 5.33 ac. DWP dozer 4 30.41 $18, 752 <br /> <br />015 -Rough grade facilities area dozer 4 139.7 $81,524 <br />016 -Rip roads ripper 1 11.7 $1, 766 <br />017 -Finish grade OR areas receiving topsoil grader 1 27.51 $2,993 <br />018 -Finish grade refuse pile grader 1 21.8 $2,377 <br />02a -Seal 6 alluvial wells borehole 1 12.0 $19,851 <br />006 -Seal Portals mineseal 1 16.0 $36,049 <br />013 -Rip and spread "cover' material on Refuse area dozer 4 256.5 $240,425 <br />SUBTOTALS: 1,197.2 $1,575,956 <br />' includes inflation /actor atliustment of : NA % TOTAL DIRECT COST' ~ $1,575,956 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - Liability InSUfanCe : 1.55 °/a Of direct total = $24,427 <br />Performance bond : 1.05 % of direct total = $16,548 <br />Job superintendent : 598.64 hrs•...$/hr: $33.50 total = $20,054 <br />Profit: 10.00 %ofdirect total= $157,596 <br />' assurre net hours = 5tl% al task hours TOTAL O 8 P = $216, 625 <br /> CONTRACT AMOUNT (direct+08P)= $1,794,581 <br />PROJECT MANAGEMENT- <br />Engineering work and/or contracUbid preparation : 4.25 % of Intr. NA total = $76,270 <br />. Reclamation management and/or administration : 5.00 % of Intr. NA total = $89,729 <br />CONTINGENCY- NA• NA total= NA <br />'onntingenrias acrnunted for at tasklevel TOTAL INDIRECT COST= $384,624 <br />TOTAL BOND AMOUNT (direct + indirect) _ $1,960,579 <br />~Y ti z,.~3 - z Q~ufsEO y/Dz <br />