Laserfiche WebLink
e7iz6~zaee ee;ae <br />7194385327 <br />KIOWA CNTY CLERK <br />• <br />with approximately 8 inches of overburden and 4 inches of topsoil consistent with the <br />reclamation plan. <br />Phase 2 will begin with the stockpiling of topsoil in the south portion of the area and <br />segregated from the overburden stockpile of phase 1 to prevem contamination. The <br />overburden of Phase 2 will be stockpiled in the north portion of the area. Hitting will <br />proceed in the same manner as Phase I . <br />Sand and gravel are the primary commodities to be extracted and will be distnbuted <br />on Kiowa County roads. There are no expected incidental products to be mined. <br />PAGE 03 <br />