My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE113113
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE113113
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:09:19 PM
Creation date
11/24/2007 10:15:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004038
IBM Index Class Name
Permit File
Doc Date
5/24/2004
Doc Name
110c App and Exhibits
From
Rio Blanco County
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBTI' D <br />RECLAMATION PLAN <br />The reclamation of the affected land will be re-vegetated to restore the entire amount of <br />affected land to rangeland. The post mining land is consistent with adjacent land. Side <br />slopes will be no greater than 3:1 and the floor of the mined azea will be at a slope of no <br />less than one percent. compacted areas will be ripped during reclamation and all <br />overburden, excess pit fines, and pit waste material will be placed in a course duectly <br />above the previously mined azeas. Topsoil that was stockpiled, will be spread evenly <br />over the re-contoured site to a depth of 6 inches or more. The site will then be tilled and <br />firmed to prepaze a suitable seed bed. Seeding will be done in accordance with the <br />recommendation of the Bureau of Land Management. Re-contouring, furrowing, ripping <br />and seeding will be done progressively in conjunction with the excavation of the material. <br />A. Overburden, pit fines and pit waste material will be placed atop the pit floor and <br />sides evenly and contoured to accept the stockpiled topsoil. <br />B. Side slopes will be no greater than 3:1 and the floor of the mined azea will be at a <br />slope of no less than one percent. <br />C. (i) Topsoil which was stockpiled, will be spread evenly over the re-contoured <br />side slopes to a depth of 6 inches or more. <br />(ii) The site will be tilled and firmed to prepare a suitable seed bed. Seeding <br />of the side slopes will be done in the late fall (September 1st or later) prior <br />to the soil freezing. No fertilizer will be applied. <br />(iii) The following grass species will be used to re-seed the site. This rate is <br />based on pounds of pure live seed per acre. <br />SPECIE VARIETY POUNDS PLS/ACRE <br />Western wheatgrass Arriba 3.2 <br />Thickspike wheatgrass Critana 2.2 <br />Streambank wheatgrass Siberian 2.2 <br />Russian wildrye Vinal 2.0 <br />Crested wheatgrass Ephraim 2.0 <br />Total Pounds PLS/Acre 11.6 <br />(iv) Seed will be drilled with a grass drill having double disk openers and <br />packer wheels. Planting depth at approximately %z inch. In areas that <br />cannot be drilled, seed will be broadcast at double seeding rate and <br />harrowed into the soil. <br />
The URL can be used to link to this page
Your browser does not support the video tag.