My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE113006
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE113006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:09:14 PM
Creation date
11/24/2007 10:10:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977248
IBM Index Class Name
Permit File
Doc Date
5/24/1994
Doc Name
Environmental Report
From
Blake Mining Co.
To
DMG
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
X. Contamination Contro] - Area and Equipment <br />1. Policy <br />Controlling egress of radioactive materials from <br />their normal containment is considered an important <br />adjunct to personnel and environmental protection. <br />Therefore, all reasonable effort will be made to <br />limit radioactive materials contamination to the <br />lowest extent practicable. <br />2. Program <br />Radioactive materials will normally be contained in <br />vats, tanks and other ,such process equipment within <br />the restricted area. These "production areas" will <br />be kept as clean and free of transient radioactive <br />materials as may be practicable in the routine of <br />facility operation. This will normally consist of <br />good housekeeping practices such as "hosing-down" <br />floor and pad areas, keeping work and equipment <br />surfaces as free of fugitive dusts as possible, etc. <br />Three types of surveillance and monitoring programs <br />will be implemented to assure continuing effective- <br />ness of contamination control efforts: <br />2.1 Production Area Surveillance <br />The Radiation Protection Department will conduct <br />visual inspections of all production areas no <br />less frequently than twice monthly. Noted build <br />ups of process materials will be reported to <br />the Leaching Foreman for remedial action. <br />26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.