My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE112763
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE112763
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:09:03 PM
Creation date
11/24/2007 9:51:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999005
IBM Index Class Name
Permit File
Doc Date
5/10/1999
Doc Name
FN M-99-005 ALL RITE PAVING AND REDI MIX NORTH RIVER PIT ADEQUACY LETTER
From
DMG
To
BANKS AND GESSO LLC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />-3- <br />3. Your answer to this item included the statement "By law, a gravel well permit will have <br />to be obtained prior to exposing appropriated waters of the Arkansas River Basin. This <br />well permit will be obtained prior to mining." This commitment satisfies the Division's <br />concern regarding the legality of your plan to reclaim the site to a lake. <br />4. OK <br />Exhibit J - Veeeta[ion Information <br />1. Your answer to this item included the statement. "Prior to any excavation on the site, the <br />Pueblo Corps of Engineers District Office will be consulted and delineation may have to <br />be performed, resulting in a "404" permit... It is the intention of the applicant to abide <br />by any regulatory authority that the Corps may impose upon the mining of the proposed <br />permit area. Prior to any excavation on the site, a Corps of Engineers permit will be <br />obtained if required." This commitment satisfies the Division's concerns regarding the <br />possibility ofjurisdictional wetlands in the proposed extraction area. <br />Exhibit L -Reclamation Costs <br />The Division will review the reclamation costs of your application when the changes to <br />the mining and reclamation plans that you have stated will be submitted are available for <br />review. <br />Exhibit S -Permanent Man-Made Structures <br />a-OK <br />b-OK <br />c-OK <br />d-OK <br />e-OK <br />f -Please provide a copy of a more definitive letter of agreement between Mr. And Mrs. <br />Coulter and All Rite Paving and Redi-Mix regarding the Coulter's two wel]s and the <br />powerline to those wells. The letter should state that All Rite Paving and Redi-Mix will <br />repair any damage to those structures. The letter should be signed by a company <br />representative, with authority to sign such a letter. <br />g-OK <br />
The URL can be used to link to this page
Your browser does not support the video tag.